Product details
Specifications
- Combats rising damp and residual construction moisture
- For subfloors with no effective structural DPM
- Up to 98% RH on cementitious screeds, 90% on anhydrite
- Suitable for heated screeds
- Solvent free, cures in about 4½ hours
Pack size5 kg
Pack sizes5 kg and 10 kg
ColourBlue
Minimum temperature10°C, air and background
Working timeAbout 20 minutes at 20°C
Cure timeAbout 4½ hours at 20°C
Suitable subfloorsCementitious screeds (including heated), concrete, calcium sulphate and anhydrite screeds, existing ceramic, porcelain and natural stone tiles
CoverageA2 trowel: 12.5 m² per 5 kg, 25 m² per 10 kg. B1 trowel: 10.5 m² and 21 m². B2 trowel: 9 m² and 18 m²
InstallationMix both parts, apply in a single coat with a notched trowel or roller onto a clean, sound subfloor
ManufacturerKelmore
01
Measure your area
Measure the area you are covering and keep the total to hand.
02
Check the coverage
Check the coverage on this page against your area, and round up to whole packs.
03
Order it together
Order everything the job needs at once so it arrives in one delivery.



